Info Image

Cisco, Microsoft Partner to Boost Transatlantic Cable Capacity to 800Gbps

Cisco, Microsoft Partner to Boost Transatlantic Cable Capacity to 800Gbps Image Credit: Volff/Bigstockphoto.com

Cisco announced that they have successfully transmitted 800Gbps on the Amitié transatlantic communications cable, which runs 6,234 kilometers from Boston, Massachusetts to Bordeaux, France.

The continued growth of cloud and explosion of AI services is driving the need for greater subsea network capacity, which requires advanced coherent transmission systems that support higher performance. This trial was conducted to target improvements in subsea transmission to provide increased performance and capacity.

Amitié submarine cable features Space Division Multiplexing (SDM) technology with 16 fiber pairs, more than traditional subsea cables, with repeater power shared across the fiber pairs to deliver the highest cable capacity.

This real-time field trial exceeded any industry trial performance to date with Dense Wavelength Division Multiplexing (DWDM) 800G in a 150GHz channel spacing, equivalent to a spectrum efficiency of 5.33bit/s/Hz and a maximum spectral efficiency of 5.6bit/s/Hz. In addition, 600G was transmitted over 12,469 kilometers for a trans-Atlantic loopback configuration. This is the first time a 140Gbaud single carrier signal was demonstrated live, and is the longest distance ever reported at single carrier 600G DWDM transmission on an SDM cable.

The Amitié cable, a transatlantic submarine cable connecting the US, UK, and France, is now part of Microsoft’s global network supporting all Microsoft services.

The trial was performed with the Cisco NCS 1014 platform enabled by Acacia’s Coherent Interconnect Module 8 (CIM 8), which is powered by its Jannu digital signal processor and advanced silicon photonics. Both products are available today and actively deployed in multiple networks.

Bill Gartner, SVP Optical Systems and Optics, Cisco

In the era of AI, reliable and fast network connections are more important than ever. Working with Microsoft on the Amitié cable to demonstrate the potential for improved overall network capacity with 800G at these distances is a significant milestone for an SDM cable, and we’re proud to drive the innovations that pave the way for ever increasing network capacity needs.

Jamie Gaudette, GM of Cloud Network Engineering, Microsoft

The transmission of 800G over 6,234 kilometers is a milestone that demonstrates SDM cables can deliver increased capacity over traditional subsea cables. This field trial demonstrates what is now a commercial technology for subsea routes, and we can improve the network capacity to help drive digital transformation for people, organizations, and industries around the world.

NEW REPORT:
Next-Gen DPI for ZTNA: Advanced Traffic Detection for Real-Time Identity and Context Awareness
Author

Ray is a news editor at The Fast Mode, bringing with him more than 10 years of experience in the wireless industry.

For tips and feedback, email Ray at ray.sharma(at)thefastmode.com, or reach him on LinkedIn @raysharma10, Facebook @1RaySharma

PREVIOUS POST

A1 Telekom Austria Partners with Amdocs to Modernize its Digital Business Systems in Bulgaria

NEXT POST

Ciena’s WaveLogic 5 Extreme Implemented by Telia Lithuania for 800Gb/s Wavelength Service